LEED v5 makes changes to the energy and atmosphere credit category impacting energy modeling, building performance standards, and engineering decisions

[Updated May 28, 2026] USGBC has extended the deadline to register for certification under LEED v4 and v4.1. LEED projects now have until June 30, 2027 to register under v4 and v4.1, giving them an extra year to navigate the best decision for their certification.

How does this timeline extension impact the certification process? Any projects that weren’t ready to make the jump to v5 now have the runway to do it. Simultaneously, projects that were rushing to register this month under v4 or v4.1 now have a little more breathing room to get started.

—

LEED® certification has been the industry standard for both new and existing sustainable building projects. As with any widely used rating system, LEED is subject to ongoing changes and elevated requirements to ensure that certified projects have satisfied clear and verifiable requirements that align with the most advanced business, financial, and environmental health standards.

With these changes can come uncertainty and confusion, both of which may hold up the progression of your project. So, with that in mind, we’d like to highlight a few key shifts coming in LEED v5 that are important to consider as you plan for certification.

Timeline of Updates to LEED

Leadership in Energy and Environmental Design (LEED) was created in the 1990’s to establish a standard for sustainable buildings across nation. Fast forward to today, LEED has become the most established standard for green buildings globally.

In 2019, USGBC launched LEED v4.1 Building Design and Construction (BD+C), Interior Design and Construction (ID+C), Residential, Cities and Communities. This launch incorporated feedback from LEED v4, acting as a gradual step to elevated certification standards.

In April 2025, registration for LEED v5 opened for BD+C, ID+C, O+M, and Cities. As the latest version, LEED v5 makes a stronger move towards decarbonization and long-term operational resilience. Let’s look at a few of the many changes and what they mean for LEED project teams.

EAp1: Operational carbon projection and decarbonization plan pre-requisite (v5 BD+C)

What It Is: This new pre-requisite for LEED v5 BD+C projects was designed to predict how design decisions will affect the project’s operational carbon emissions in the long run. Its requirements include:

  • Design Analysis – Conduct simplified energy modeling to understand efficiency, peak load reduction, and decarbonization measures
  • Site Energy Estimate – Submit estimated annual site energy consumption to USGBC
  • Review Carbon Projection – USGBC generates a business-as-usual (BAU) projection with the Site Energy Estimate data to estimate the project’s carbon emissions over the next 25 years. Projects subject to a Building Performance Standard (BPS) must align their BAU projection with the ordinance to ensure future compliance.
  • Decarbonization Plan – Projects need to design for electrification (exempting them from making a plan) or develop a 25-year decarbonization plan that plans future retrofits, equipment replacements, and electrification readiness strategies.

What It Solves: The foundational problem this prerequisite addresses is the historic disconnect between how a building was designed to perform and what happens to it over the course of its operational life. EAp1 closes this gap for new development projects, encouraging early preparation for decarbonization strategies. Many building owners today are scrambling to develop decarbonization plans under pressure from Building Performance Standards (BPS) compliance deadlines, often for buildings that were never designed with those goals in mind.

Project Outcomes: The design analysis requirement fundamentally changes when engineers need to be at the table. EAp1 pushes energy and carbon analysis into early schematic design, where system type decisions, fuel source selections, and peak load strategies are still being determined.

Additionally, it elevates the energy model from an internal design tool to a formal submission with documented downstream consequences. The annual energy use prediction feeds directly into USGBC’s BAU carbon projection, which in turn informs the decarbonization plan — meaning the accuracy and completeness of the model is paramount.

Perhaps most importantly, this prerequisite means buildings are beginning their operational life with infrastructure, data, and a roadmap already in place — whereas existing buildings are now being forced to develop similar plans reactively, often at considerably greater cost and under regulatory pressure.

EAp1: Estimated Energy Use and Operational Carbon Projection (v5 ID+C)

What It Is: Similar to the EAp1 prerequisite for BD+C, EAp1 for ID+C requires projects to understand the scale and long-term impact of the project’s operational carbon emissions. It requires submission of project data and annual energy use to USGBC. Projects without an energy model will need to provide project information, high-load amenity information, and energy-related information. USGBC will provide the project team with a 10-year operational carbon projection which they must sign off on.

What It Solves: Whereas ID+C projects could previously earn certification based on material choices, lighting efficiency, and indoor air quality (IAQ) strategies, they now must consider the operational impacts of the project. The owner’s sign-off requirement ensures they are informed of their project’s decision-making.

Project Outcomes: The goal of this prerequisite is to enable building stakeholders to visualize how their current design decisions will impact their long-term operational emissions and to ensure that they are planning for low-carbon outcomes from the project’s inception.

For projects that do have an energy model, the prerequisite is relatively straightforward — submit the modeled annual energy use and sign off on the projection USGBC generates. For projects without an energy model, the requirement puts more burden on the team to compile and document system-level information that would otherwise live inside a model.

For tenants and building owners in BPS jurisdictions, this projection serves as an early indicator of whether the space is likely to meet compliance under their ordinances before the consequences of violations materialize.

EAp4: Energy Metering and Reporting Pre-Requisite (v5 BD+C, ID+C, and O+M)

What is it: The Energy Metering and Reporting is a requirement applies to all certification projects across BD+C, ID+C, and O+M. Previously called the Building-Level Energy Metering prerequisite in LEED v4 and v4.1, it is now renamed with an expanded scope.

EAp4 requires energy monitoring and recording in accordance with ASHRAE Standard 90.1-2019 (for projects registered before January 1, 2028) or 90.1-2022 (for projects registered on or after January 1, 2028). Any major renovations and buildings exempt from ASHRAE 90.1 still need to install meters that monitor whole-building energy use of each energy source and peak electricity at least every month.

The “reporting” aspect of this pre-requisite requires buildings to commit to reporting their monthly energy data, on-site renewable energy generation data, and their peak electrical demand to USGBC annually.

What it solves: There has historically been somewhat of a gap between how buildings are predicted to perform in their design stage and how they perform as a fully operational asset. Without metering infrastructure in place, there is no way to identify this gap.

Project Outcomes: One consistent theme across many of the LEED v5 changes is that knowing only how much energy a building uses is no longer sufficient. It is equally important to know what energy sources are being used and when they are used. Project engineers will need to strategize metering for all energy sources individually in the design phase.

For property owners building in jurisdictions with a BPS, the more intensive metering infrastructure that EAp4 requires will ensure your building is prepared for current energy reporting requirements and any future changes to public disclosures. By integrating these measures early in the project’s life cycle, the building will not need to implement metering devices in the future when they need to record data for local benchmarking and BPS laws.

EAc1: Electrification Credit (v5 BD+C and ID+C)

What is it: The electrification credit is new in LEED v5 and is intended to reduce or eliminate on-site fuel combustion, improve air quality, and lower building emissions as the power grid moves away from carbon-producing fuels.

What it solves: LEED v4 and v4.1 rewarded energy efficiency but did not directly penalize on-site combustion. With electrification becoming the dominant strategy to building decarbonization, this credit addresses dependency on natural gas and plays directly into other LEED v5 requirements like the Operational Decarbonization Plan pre-requisite.

Project Outcomes: The Electrification Credit is one of the most engineering intensive credits under LEED v5. Conventional heating systems that burn oil, gas, or propane are disallowed except as emergency backup systems. This requires engineers to size all-electric HVAC and domestic hot water systems and design electrical infrastructure to support the equipment.

Buildings that fulfill this credit that are affected by BPS ordinances will see a reduced compliance risk relative to buildings that are not fully electric because they will need to plan less future retrofits to satisfy the requirements of their local ordinance. To achieve platinum, projects must eliminate on-site combustion except for emergencies, use 100% renewable energy, and reduce embodied carbon. This has direct implications for engineers who must now design all-electric HVAC, water heating, and building systems.

EAc2: Reduce Peak Thermal Loads (v5 BD+C)

What it is: This is a brand-new credit in LEED v5 BD+C where projects can choose a combination of pathways to earn up to 5 points for both New Construction and Core and Shell. Its overall goal is to minimize peak heating and cooling demands.

What is solves: The credit emphasizes envelope and ventilation design that lowers the highest heating and cooling loads, thus reducing demand on the grid during peak demand times. With electrification requirements increasing and a rise in overall power grid demand, this credit is meant to reduce dependency on the grid and develop a more resilient building.

Project Outcome: Since this credit is centered around the building envelope, the team will need to include architects and consultants in the conversation earlier in the design planning process to maximize the potential to gain points. Engineers will need to prepare the correct equipment to optimize the building envelope’s performance. Additionally, energy modeling may become an important tool in this phase of the project to demonstrate peak load reduction through simulation, as well as additional field testing required to confirm select credit compliance options.

EAc5: Enhanced Commissioning Credit (v5 BD+C)

What it is: The Enhanced Commissioning Credit is an optional credit under LEED v5 that offers 4 points for BD+C New Construction and 3 points for Core & Shell. There is a comparable credit for ID+C projects. Under LEED v4 and v4.1, the Enhanced Commissioning Credit offered points for early Certified Commissioning Authority (CxA) engagement and building envelope commissioning – both of which are now required under EAp3.

What remains in the Enhanced Commissioning Credit are higher-tier deliverables including enhanced commissioning for MEP system and building enclosure, and monitoring-based commissioning (MBCx).

What it solves: The intent behind the Enhanced Commissioning Credit is to ensure that the building systems maintain their energy performance over time. Moving the early engagement of a CxA to the prerequisites means that they are involved much earlier in the project’s development to ensure a more seamless implementation of commissioning plans. Similarly, expanding the scope of this credit to include MBCx with a three-year commitment to monitoring means that buildings stay on top of their systems’ performance.

Project Outcomes: EAc5 incorporates engineers deeper into the commissioning process for a longer period than previously required. Simultaneously this credit further bridges the gap between energy models and real-world performance, as the energy model becomes the benchmark against which the operational data is compared to over time.

Should My Project Certify as LEED v4 or LEED v5?

The most important consideration for your LEED certification project is regarding your timeline. Projects have until June 30, 2027 to register under LEED v4 or v4.1.

If your project is early enough in design that prerequisites and credits for your desired certification level (Certified, Silver, Gold, Platinum) can realistically be completed, v5 may be the right path. If your project is already well into design development with systems selected and documentation partially complete, locking in under v4.1 before registration closes may be the more practical choice.

Your certification level is also extremely important. Projects seeking to achieve LEED Platinum need to make intentional engineering decisions early in the design process. You should also consider your local BPS ordinances and align your certification decision with the energy performance requirements your project will face as an existing building.

These are key decisions that can greatly impact the project and its outcome. VCA Green has spent years delivering expert-level consulting for our clients, and this is a decision we are happy to help you make. While there isn’t necessarily a “best” version, there is often a best version for you.